The maintenance of many devices in the summer is not the same as the winter maintenance. The same is true of concrete mixers. Xiao Bian tells you today how concrete mixers can be maintained in the winter.
construction machinery concrete pumps
1, because of the season. After the concrete mixer is in operation, the operator is required to remove the ash on the inside and outside of the mixing tank wall of the equipment, the residue at the discharge port, and the residue on the agitator shaft and the discharge gate. The water can be used to house these equipment. Rinse, if necessary, and put in a small amount of stone and water to stir it in after ten minutes.
ready mix portable concrete batch plant made in china
2, water cleaning cars, additive boxes and its supply system. These are things that need to be done after each day of operation. In the winter, it is necessary to drain the water and residue inside the pump, additive pump, water tank, and additive tank after the end of the operation of the equipment. This will cause damage to the pump and its piping in the cold season. The pump's add-on pump runs for about a minute, covering some of the winter concrete mixer maintenance.
2016 js1000 forced concrete mixer
3. If the concrete mixer is not used in the winter, each instrument construction equipment needs to be turned on twice a week, and each startup time takes half an hour. This prevents the winter concrete mixer from causing frostbite if it is not used for a long period of time, or it may not start when it starts.